Plan a 12V auxiliary system: wire gauge, fuse size, LiFePO4 bank, DC-DC charger, and solar. The page returns an action list and a wiring diagram from the numbers you enter.
This is the build planner. Hours on a station you already own live on Power Station Runtime. One-appliance hours live on Appliance Runtime Pages.
No. Runtime hours for a station you own are on Power Station Runtime. This page sizes the 12V stack you have not built yet.
No. It is a planning worksheet. High-voltage house wiring and transfer switches stay with a licensed electrician.
LiFePO4 bank design. Do not paste lead-acid numbers into those fields.